DeveloperPrime Data Centers
LocationAvondale, Arizona
CampusPHX01
Buildings5 hyperscale data centers
Site66.5 acres
Total planned critical power240 MW

Contractor opportunity signal

ACTIVE CONSTRUCTION / EXPANSION WATCH

Prime broke ground on the first three PHX01 buildings in May 2026. Prime currently identifies PHX01-01, PHX01-02, and PHX01-03 as construction-stage and leased facilities, representing 144 MW of critical IT capacity. Buildings 4 and 5 remain part of the five-building campus, but their current status and availability should be verified from Prime’s project page rather than assumed. ARCO/Murray has publicly disclosed construction participation and scope for the first phase.

Why monitor it

Why Contractors Should Watch This Project

  • The five-building campus is planned for 240 MW.
  • The campus covers approximately 1.3 million square feet across 66.5 acres.
  • Buildings 1–3 are in construction and represent 144 MW.
  • Prime identifies a dedicated on-site substation, with Phase 1 commissioned.
  • ARCO/Murray has disclosed meaningful site, underground, substation, and core-and-shell scope.
  • Remaining phases and downstream contractor relationships are not fully public.

Verified project facts

What is publicly supported

Developer
Prime Data Centers
Location
Avondale, Arizona
Campus
PHX01
Buildings
5 hyperscale data centers
Site
66.5 acres
Total planned critical power
240 MW
Total planned size
Approximately 1.3 million sq. ft.
Data halls
20
Reported investment
More than $3 billion according to Prime
Groundbreaking
May 21, 2026
First phase
Buildings 1–3 / 144 MW
Capacity per building
48 MW
Size per building
Approximately 267,000 sq. ft.
Utility provider
SRP
Substation
On-site / 250 MW
Substation Phase 1
Commissioned
Cooling
Closed-loop air and liquid cooling

Building-by-building status

Campus phases

PHX01-01Construction48 MW · 267,000 sq. ft. · Leased
PHX01-02Construction48 MW · 267,000 sq. ft. · Leased
PHX01-03Construction48 MW · 267,000 sq. ft. · Leased
PHX01-04Not publicly confirmed in the sources reviewed48 MW · 267,000 sq. ft.
PHX01-05Not publicly confirmed in the sources reviewed48 MW · 267,000 sq. ft.

Contractor Relationship Map

Who is publicly connected — and what remains unknown.

Confirmed relationship

Prime Data Centers

Developer

Publicly Confirmed Scope: Development of the PHX01 campus.

Confidence: High · Source: Prime Data Centers
Confirmed relationship

ARCO/Murray

Primary Construction Partner

Publicly Confirmed Scope: Major site development, underground coordination, private-substation coordination, and core-and-shell construction for Buildings 1–3.

Confidence: High · Source: ARCO/Murray
Confirmed relationship

SRP

Utility

Publicly Confirmed Scope: Utility provider for the PHX01 campus.

Confidence: High · Source: Prime Data Centers
Unknown major scopes

Major Scopes Not Yet Publicly Confirmed

Electrical SubcontractorNot publicly confirmedMechanical SubcontractorNot publicly confirmedFire ProtectionNot publicly confirmedControlsNot publicly confirmedLow VoltageNot publicly confirmedSecurityNot publicly confirmedCommissioningNot publicly confirmed

Why This Matters to Contractors

The developer is only the first layer. For subcontractors, the opportunity often depends on identifying who controls construction, who holds major trade packages, which scopes remain unresolved, and which future phases may create another procurement cycle. MyDataCenterScout separates known relationships from assumptions so contractors know where further research is still required.

Procurement intelligence

Known and unknown

Developer
Prime Data Centers
Primary construction partner
ARCO/Murray
ARCO public scope
Site development, underground coordination, private-substation coordination, core and shell for Buildings 1–3
Utility
SRP
Hyperscaler / tenant for Buildings 1–3
Leading hyperscaler — identity not publicly disclosed in approved sources
Electrical contractor
Not publicly confirmed in the sources reviewed
Mechanical contractor
Not publicly confirmed in the sources reviewed
Civil subcontractor
Not publicly confirmed in the sources reviewed
Fire protection
Not publicly confirmed in the sources reviewed
Controls
Not publicly confirmed in the sources reviewed
Low voltage / security
Not publicly confirmed in the sources reviewed
Commissioning
Not publicly confirmed in the sources reviewed
Formal bid date
Not publicly confirmed in the sources reviewed
Procurement contact
Not publicly confirmed in the sources reviewed

Trades to watch

Relevant scopes

  • Electrical
  • Mechanical
  • Civil / sitework
  • Underground utilities
  • Structural / core-and-shell
  • Fire protection
  • Controls
  • Low voltage
  • Security
  • Commissioning
  • Equipment installation
  • Specialty mission-critical services
  • Future-phase site development

What contractors should watch next

Next public signals

  • Progress on Buildings 1–3
  • Current status of PHX01-04
  • Current status of PHX01-05
  • Additional ARCO/Murray subcontractor relationships
  • Electrical contractor identification
  • Mechanical contractor identification
  • Fire protection awards
  • Controls contractor identification
  • Low-voltage/security relationships
  • Commissioning relationships
  • Equipment/vendor awards
  • Buildings 4 and 5 construction milestones
  • Additional permits
  • Vendor-prequalification activity
  • Public identification of the hyperscaler

Contractor takeaway

What this means

PHX01 is an active construction project with a publicly visible construction ecosystem. Prime has broken ground on the first three buildings, and ARCO/Murray has disclosed substantial site-development, underground, substation-coordination, and core-and-shell scope. The next intelligence questions are which subcontractors are under ARCO/Murray, which packages remain addressable, when Buildings 4 and 5 move forward, and which specialty or downstream scopes become visible.

Source-backed context

Confirmed relationship

ARCO/Murray — Primary construction partner / publicly disclosed construction participant

  • Major site development
  • Underground coordination across multiple disciplines
  • Private substation coordination
  • Core-and-shell construction for Buildings 1–3

Sources

Read the source trail

$99 one-time Opportunity Brief

Trying to win data center work in Arizona?

Tell us your trade, geography, experience, and target contract size. MyDataCenterScout will research the market and identify an opportunity that fits your company.

Find My Next Opportunity